首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   78篇
  免费   32篇
  国内免费   1篇
  2024年   1篇
  2023年   3篇
  2020年   2篇
  2018年   1篇
  2017年   3篇
  2016年   8篇
  2015年   4篇
  2014年   5篇
  2013年   2篇
  2012年   6篇
  2011年   5篇
  2010年   4篇
  2009年   9篇
  2008年   4篇
  2007年   9篇
  2006年   10篇
  2005年   11篇
  2004年   5篇
  2003年   2篇
  2002年   4篇
  2001年   2篇
  2000年   1篇
  1999年   3篇
  1998年   1篇
  1996年   2篇
  1992年   2篇
  1991年   1篇
  1989年   1篇
排序方式: 共有111条查询结果,搜索用时 15 毫秒
1.
This article studies a min‐max path cover problem, which is to determine a set of paths for k capacitated vehicles to service all the customers in a given weighted graph so that the largest path cost is minimized. The problem has wide applications in vehicle routing, especially when the minimization of the latest service completion time is a critical performance measure. We have analyzed four typical variants of this problem, where the vehicles have either unlimited or limited capacities, and they start from either a given depot or any depot of a given depot set. We have developed approximation algorithms for these four variants, which achieve approximation ratios of max{3 ‐ 2/k,2}, 5, max{5 ‐ 2/k,4}, and 7, respectively. We have also analyzed the approximation hardness of these variants by showing that, unless P = NP , it is impossible for them to achieve approximation ratios less than 4/3, 3/2, 3/2, and 2, respectively. We have further extended the techniques and results developed for this problem to other min‐max vehicle routing problems.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
2.
划船效应补偿是高精度捷联惯导系统解算的重要环节。通过研究其误差特性,推导了新的通用划船效应补偿公式。同时提出了角振动环境中伪划船效应的存在,对伪划船效应的产生原因、表达方式以及对捷联惯导系统的影响进行了分析。对新的补偿算法在划船效应和伪划船效应下进行了仿真试验。  相似文献   
3.
We consider a short‐term capacity allocation problem with tool and setup constraints that arises in the context of operational planning in a semiconductor wafer fabrication facility. The problem is that of allocating the available capacity of parallel nonidentical machines to available work‐in‐process (WIP) inventory of operations. Each machine can process a subset of the operations and a tool setup is required on a machine to change processing from one operation to another. Both the number of tools available for an operation and the number of setups that can be performed on a machine during a specified time horizon are limited. We formulate this problem as a degree‐constrained network flow problem on a bipartite graph, show that the problem is NP‐hard, and propose constant factor approximation algorithms. We also develop constructive heuristics and a greedy randomized adaptive search procedure for the problem. Our computational experiments demonstrate that our solution procedures solve the problem efficiently, rendering the use of our algorithms in real environment feasible. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
4.
We consider the problem of scheduling orders on identical machines in parallel. Each order consists of one or more individual jobs. A job that belongs to an order can be processed by any one of the machines. Multiple machines can process the jobs of an order concurrently. No setup is required if a machine switches over from one job to another. Each order is released at time zero and has a positive weight. Preemptions are not allowed. The completion time of an order is the time at which all jobs of that order have been completed. The objective is to minimize the total weighted completion time of the orders. The problem is NP‐hard for any fixed number (≥2) of machines. Because of this, we focus our attention on two classes of heuristics, which we refer to as sequential two‐phase heuristics and dynamic two‐phase heuristics. We perform a worst case analysis as well as an empirical analysis of nine heuristics. Our analyses enable us to rank these heuristics according to their effectiveness, taking solution quality as well as running time into account. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
5.
Consider a project during the life cycle of which there are cash payouts and in‐flows. To better meet his financial commitments, the project owner would like to meet all deadlines without running out of cash. We show that the cash availability objective is similar to the total weighted flowtime used to measure work‐in‐progress performance in the scheduling and inventory control literatures. In this article we provide several specialized solution methods for the problem of minimizing total weighted flowtime in an arbitrary acyclic project network, subject to activity release times and due dates, where the activity weights may be positive or negative and represent cash in‐ and out‐flows. We describe the structure of an optimal solution and provide several efficient algorithms and their complexity based on mincost and maxflow formulations. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
6.
为了解决带有辅助摆臂的智能搜救机器人自动规划构型以实现自主越障的难题,提出一种能够适应复杂地面形状的搜救机器人越障构型规划新方法,其核心是一种高适应性、高效率的机器人姿态预测算法。通过将地形表示为离散的点集,建立了搜救机器人的单侧姿态预测数学模型;进一步提出了快速求解该问题的算法,每秒可预测1 000~1 500个姿态。基于此,设计了机器人越障过程中状态、动作的评价指标,运用动态规划算法与滚动优化思想构建了具有优化能力的、能够实时运行的构型规划器。仿真与实物实验的结果表明,该方法能够使机器人自主调整构型穿越复杂地形,且相较强化学习算法和人工操作具有更平稳的越障效果。  相似文献   
7.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
8.
在等概率抽样群体的条件下,讨论了演化算法的隐合并行性,得到了算法每代隐含处理的模式长度不超过ls(0≤ls≤l)的不同模式期望数的精确表达,并估计了其上下界.  相似文献   
9.
机械抖动激光陀螺捷联惯性导航系统中通常要对陀螺信号进行预滤波处理以消除抖动偏频,数据滤波后其幅值和相位的变化引入了附加的姿态算法误差.为了减小此误差,研究了抖动解调滤波器的特性以及数据滤波对系统姿态算法精度的影响,推导了与滤波器匹配的姿态算法优化公式.优化算法仅修正了传统算法系数,不增加算法实现难度.仿真和实验表明,优化算法能有效减小滤波器引入的附加姿态算法误差,明显改善算法精度,有很高的工程实用价值.  相似文献   
10.
最小费用树   总被引:2,自引:0,他引:2       下载免费PDF全文
本文在赋边权w和顶点权θ的网络中,建立了最小费用树问题的网络模型。文中对问题的复杂性进行了讨论并给出了求解问题的算法  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号